top of page

ENGINEERING FORMSETS:

DESIGN A SYSTEM SPECIFIC TO YOUR NEEDS

Engineering

Engineerig Formsets
Engineerig Formsets

We have a team of designers using state of the art CAD modeling and design tools to create the best formwork system for your business or building project. 

Our engineers work closely with you to convert your architectural plans to a 3D-modeled shell.  Factoring in your project and budget requirements, they will develop an efficient and cost-effective forming system specifically for you. Our designers focus on the key aspects your production crews face in the field – placing concrete safely and productively. Our design engineers will work closely with your engineers and engineering design requirements to insure the formwork is consistent with structural specifications.

Your account representative will present this engineered forming solution to you with an organized equipment list and CAD generated Setup Plans.  This will outline your system proposal clearly and provide easy to use jobsite instructions for your equipment.  

After you’ve approved the formwork solution, the engineering team delivers production ready drawings and detailed work instructions to launch the Manufacturing cycle for your order.

Anchor 1

Getting Started

We can help you convert your project  from traditional construction methods to quality cast-in-place (CIP) construction with our forms:

  1. You send your project plans to CFS Forsa for preliminary review.

  2. A CFS Forsa team of 2-3 professionals reviews the plans and prepares a proposal with several forming system choices.

  3. The team presents the proposal, including all systems choices, with preliminary cost estimates for both the systems and the structure.  This lets you calculate your savings.

  4. You choose the system and provide an Engineering Deposit. equal to 5%* of the system investment price. We provide a completed "Shell Drawing" in 3 dimensions to review with design professionals on your project.

  5. After you carefully review, you approve the final shell and confirm the final forming system and components to be delivered to your site.

  6. Our team prepares a final bill of materials (BOM), and manufacturing order, according to your instructions from Step 5.  You send a deposit equal to 45% of final BOM amount to start manufacturing.  You receive a "Promise" shipping date within 48 hours of deposit receipt.

  7. Our "Set Up Team" receives your system components  from manufacturing and erects the complete formwork assembly in the Concrete Home Center to assure total "fit up" and "quality assurance".  This is the final verification of the entire system.

  8. You or your designated representative come to the Concrete Home Center for a final inspection of the complete assembly.  Inspection may also be done from your office via Internet Webcast.

  9. Within 48 hours of the final inspection, we'll have your shipment containerized, sealed, and shipped to your site.  You provide the final 50% of the payment by the time of container departure.

  10. A Technical Services Professional or Team arrives at your site to deliver on-site training to your work crews, contractors, supervisors and Project Managers.

Please contact us so we may have an opportunity to consult with you about converting your project to cast-in-place concrete with aluminum forming systems from Concrete Forming Solutions.  You can reach us by:

 

* - The percentage of engineering deposit may vary depending on the order, customer, or country.  See the proposal from CFS Forsa for the correct deposit for your transaction.

bottom of page